Every package is a download: prompt files, working templates and a follow-up system. No subscription, no seats, no account to keep alive. Free updates for as long as the product exists and thirty days to change your mind. All twelve trade editions plus the generator for any other trade come with every package, and Complete and Pro include the First-Hour Module.
$19
one-time · 5 files + 12 trade editions
Not included: video, automation, dashboard, First-Hour Module.
MOST POPULAR
$79
one-time · 14 components
Not included: the setup call.
$397
one-time · 17 components + call · eight clients a month
Not included: training for a whole crew.
| What is in it | Starter $19 | Complete $79 | Pro $397 |
|---|---|---|---|
| Twelve trade editions + generator for any other trade | |||
| First-Hour Module | – | ||
| Photo to Quote and Voice to Quote prompts | |||
| Quote template and margin calculator | |||
| Follow-up swipe file, 12 messages | |||
| Margin check and review request prompts | – | ||
| Quote video script | – | ||
| Automated follow-up workflow | – | ||
| Never-Lose-a-Lead dashboard | – | ||
| 45-minute setup call | – | – | |
| Review of your first 3 quotes | – | – | |
| Priority support | – | – |
One-time payment on all three, free updates for as long as the product exists, 30 days to get your money back, and Pro is capped at eight clients a month.
Twelve trades are ready to go, each with its own photo prompt, exclusions list, quote template and follow-up messages. If your trade is not on the list, you build it yourself with the generator: you fill in your trade, your units and the three jobs you do most often, and the whole set is rewritten for you. Two to five minutes.
All twelve trade editions and the generator are included with the Starter Kit, with Complete and with Pro.
Respond within the hour to an inquiry that just came in, instead of waiting until the quote is finished.
In March 2011, Harvard Business Review published research by Oldroyd, McElheran and Elkington covering 2,241 U.S. companies: responding within an hour made a company nearly seven times more likely to qualify a lead. Drift’s Lead Response Report, covering 433 companies, found that only 7 percent replied within five minutes.
Two pages per trade, so you know what to look for before you fill in the price.
The trade card is included with each of the twelve trade editions and also comes out of the generator.
The link appears the moment payment goes through.
Sent to the address you type at checkout. Download it as often as you like.
Open START-HERE. It tells you which file to use first so you can quote a job today.
The email comes from a real address. Reply and you reach me, not a ticket queue.
Email me inside 30 days and you get your money back. No form, no reason needed. That applies to Pro as well, even if the setup call or the quote review has already been delivered. Read the refund policy.
Here is what it looks like
Four trades, four real jobs. On the left the photos and the one line the tradesman types, on the right the quote that comes back. Every amount stays blank, because you set your own prices: wherever money belongs it says [PRICE].
| Quote number | Q-2026-0148 |
| Date issued | 08/11/2026 |
| Valid until | 09/10/2026 |
| Job address | [JOB ADDRESS] |
| Prepared by | [YOUR NAME] |
I set the site up first, clean the whole roof field, take off moss, deposit and loose material and let the roof dry. Then the repair: the blistered lap cut open, pressed back and dressed, the loose edge trim refixed, the open sealant joint renewed and a new boot detail at the penetration. After that I prime the whole field.
The top coat goes on in two passes, with reinforcement fleece at the laps, along the edge trim and around the penetrations and the skylight. The work needs a dry roof and a workable surface temperature. [CHECK: application data for the chosen system] At handover we walk the roof together and you get photos of every repaired point.
You choose the brand. Coating material is figured in gallons, [QTY] gallons at the coverage rate of the chosen system. The number of passes and the system together set the warranty term.
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Site set-up, edge protection, ladder and access equipment | 1 | item | [PRICE] | [PRICE] |
| Cleaning the roof surface, removing moss, deposit and loose material | 520 | sq ft | [PRICE] | [PRICE] |
| Repair of the lap and the blistering, removing the old patch | [QTY] | linear ft | [PRICE] | [PRICE] |
| Repair of upstands, edge trim and wall abutment | 85 | linear ft | [PRICE] | [PRICE] |
| Primer to the prepared roof surface, material | 520 | sq ft | [PRICE] | [PRICE] |
| Top coat, two passes, reinforcement fleece in the laps | 520 | sq ft | [PRICE] | [PRICE] |
| Dressing two penetrations and the junction at the skylight | 3 | each | [PRICE] | [PRICE] |
| Flushing the outlet, waste removal and clean-up | 1 | item | [PRICE] | [PRICE] |
| Subtotal | [PRICE] | |||
| Tax [RATE]% | [PRICE] | |||
| Total due | [PRICE] | |||
The points below are not in the price. If they come to light while the work is running, I report them with a photo and a price and carry them out only on your written approval.
| Replacing decayed deck, visible once the covering is open | [PRICE] |
| Replacing the edge trim, or resetting it over its full length | [PRICE] |
| Forming an overflow in the edge detail | [PRICE] |
| Lead time from acceptance | 10 to 15 working days |
| Time on site | 3 to 4 working days |
| Weather dependent | dry roof, within the temperature limits |
10 year warranty on the coating system as installed, on the terms in the warranty schedule attached. Voided by work of others to the same roof field; it does not cover the existing covering underneath.
By signing you instruct [YOUR COMPANY] to carry out the work described above, at the total stated and on the terms set out.
Three of the six messages in the trade edition, for day 3, day 7 and day 14 after you send, in the language of this trade. The text version is below; every message also has an email version in the trade edition.
| Quote number | Q-2026-0151 |
| Date issued | 08/11/2026 |
| Valid until | 09/10/2026 |
| Job address | [JOB ADDRESS] |
| Prepared by | [YOUR NAME] |
I mask off everything that does not get coated: glazing, hardware, the sidewalk and the planting. The tower scaffold stands on the sidewalk, inside the barrier. Then I wash down and degrease the substrate, take coating that is not sound back to bare, sand up the rest and fill the damage. Rot repair to the sill is quoted by the hour and carried out only on your written approval.
Every bare and repaired area gets a primer. The finish goes on in two coats, on the moving parts and the fixed work, with a light sand between coats. The work is done dry and above the minimum surface temperature of the system. [CHECK: application data for the chosen coating system]
You choose the brand and the color. Color reference: [FILL IN: color reference]. Material is figured in gallons, [QTY] gallons at the spreading rate of the chosen system.
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Masking and protection of glazing, hardware, sidewalk and planting | 1 | item | [PRICE] | [PRICE] |
| Washing down, degreasing and dust removal | [QTY] | sq ft | [PRICE] | [PRICE] |
| Sanding, stripping back and filling the timber | [QTY] | hour | [PRICE] | [PRICE] |
| Rot repair to the sill, carried out on written approval | [QTY] | hour | [PRICE] | [PRICE] |
| Renewing sealant lines and glazing sealant | [QTY] | linear ft | [PRICE] | [PRICE] |
| Primer to bare and repaired areas, material | [QTY] | sq ft | [PRICE] | [PRICE] |
| Finish coats, two coats, moving parts: windows, dormer windows and front door | 9 | each | [PRICE] | [PRICE] |
| Finish coats on fixed work, tower scaffold and clean-up | [QTY] | linear ft | [PRICE] | [PRICE] |
| Subtotal | [PRICE] | |||
| Tax [RATE]% | [PRICE] | |||
| Total due | [PRICE] | |||
The points below are not in the price. If they come to light while the work is running, I report them with a photo and a price and carry them out only on your written approval.
| Replacing the sill where rot runs beyond repair | [PRICE] |
| Stripping back further than the areas quoted | [PRICE] |
| Controlled removal of coating that tests positive for lead | [PRICE] |
| Lead time from acceptance | 10 to 15 working days |
| Time on site | 5 to 7 working days |
| Weather dependent | dry, above the minimum surface temperature |
6 year warranty on the coating system as installed, on the terms in the warranty schedule attached. It does not cover timber that was already decayed.
By signing you instruct [YOUR COMPANY] to carry out the work described above, at the total stated and on the terms set out.
Three of the six messages in the trade edition, for day 3, day 7 and day 14 after you send, in the language of this trade.
| Quote number | Q-2026-0154 |
| Date issued | 08/11/2026 |
| Valid until | 09/10/2026 |
| Job address | [JOB ADDRESS] |
| Prepared by | [YOUR NAME] |
I clear the working area first and protect the route from the side gate. Everything moves by barrow. Then the groundwork: the existing paving and sub-base come up, I excavate to the depth needed and take the spoil and rubble out. New sub-base comes in, gets compacted in layers and is set out to the levels and the falls, away from the house wall.
The bedding layer goes down and the pavers are laid to the set falls, with edging and paver restraint along the border and the lawn. Then the fence line: two posts replaced, panels refitted. Finally soil improvement, topsoil and planting in the border and turf to the lawn. The work is weather dependent and saturated ground stops it.
You choose the paver and the planting. The number of loads out and the depth of the build-up together set the groundwork.
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Clearing the working area and protecting the route in | 1 | item | [PRICE] | [PRICE] |
| Lifting existing paving and sub-base | 430 | sq ft | [PRICE] | [PRICE] |
| Excavation and removal of spoil and rubble | [QTY] | load | [PRICE] | [PRICE] |
| Importing, compacting and leveling sub-base | 430 | sq ft | [PRICE] | [PRICE] |
| Bedding layer and laying the paving to the set falls | 430 | sq ft | [PRICE] | [PRICE] |
| Edging, curbing and paver restraint | 62 | linear ft | [PRICE] | [PRICE] |
| Soil improvement, topsoil, border planting and turf | [QTY] | each | [PRICE] | [PRICE] |
| Fence line: two posts replaced, panels refitted, green waste removed | 40 | linear ft | [PRICE] | [PRICE] |
| Subtotal | [PRICE] | |||
| Tax [RATE]% | [PRICE] | |||
| Total due | [PRICE] | |||
The points below are not in the price. If they come to light while the work is running, I report them with a photo and a price and carry them out only on your written approval.
| Extra depth of excavation once the existing build-up is open | [PRICE] |
| Forming a drainage run for surface water | [PRICE] |
| Grinding out or removing the stump in the border | [PRICE] |
| Lead time from acceptance | 15 to 20 working days |
| Time on site | 6 to 8 working days |
| Weather dependent | saturated ground stops the work |
2 year warranty on the paving and the groundwork. Establishment of planting and turf holds only where the watering schedule handed over at completion is kept up.
By signing you instruct [YOUR COMPANY] to carry out the work described above, at the total stated and on the terms set out.
Three of the six messages in the trade edition, for day 3, day 7 and day 14 after you send, in the language of this trade.
| Quote number | Q-2026-0157 |
| Date issued | 08/11/2026 |
| Valid until | 09/10/2026 |
| Job address | [JOB ADDRESS] |
| Prepared by | [YOUR NAME] |
I isolate the supply first and shut the circuits down, then secure the work area. Floors get covered and dust is kept down while chasing. Power is off for roughly one working day. [CHECK: agree with the occupier] Then I chase or route the runs in the masonry at the front, set the back boxes and run conduit, cable and raceway to every new point. In the stud wall the cable goes in before the board goes on.
The points get mounted, the three new circuits are terminated at the panel with their protection and the range and the dishwasher go on dedicated circuits. Requirements on the installation follow [CHECK: code in force and the utility's rules]. I close the chases ready for the finish trade, test and inspect, and hand over with a panel schedule filled in.
You choose the range of wiring devices. What the panel will take is settled on site, together with the free ways in it.
| Description | Qty | Unit | Unit price | Total |
|---|---|---|---|---|
| Isolating the supply and securing the work area | 1 | item | [PRICE] | [PRICE] |
| Protection of floors and dust control while chasing | 1 | item | [PRICE] | [PRICE] |
| Cutting in and setting back boxes | [QTY] | linear ft | [PRICE] | [PRICE] |
| Running conduit, cable and raceway to the new points | [QTY] | linear ft | [PRICE] | [PRICE] |
| Mounting outlets, switches and lighting points | 21 | each | [PRICE] | [PRICE] |
| Panel work, three circuits with protection | 3 | each | [PRICE] | [PRICE] |
| Connecting fixed appliances: range and dishwasher | 2 | each | [PRICE] | [PRICE] |
| Patching the wall openings, testing, handover and clean-up | 1 | item | [PRICE] | [PRICE] |
| Subtotal | [PRICE] | |||
| Tax [RATE]% | [PRICE] | |||
| Total due | [PRICE] | |||
The points below are not in the price. If they come to light while the work is running, I report them with a photo and a price and carry them out only on your written approval.
| Replacing existing wiring that proves unserviceable once opened up | [PRICE] |
| Bringing grounding and bonding up to standard | [PRICE] |
| Fault finding behind the finished walls at the front, per hour | [PRICE] |
| Lead time from acceptance | 5 to 10 working days |
| Time on site | 2 to 3 working days |
| Power off | roughly one working day, agreed with the occupier |
2 year warranty on the work carried out. It does not cover the existing installation, work of others to the same circuits, or fittings and appliances supplied by you.
By signing you instruct [YOUR COMPANY] to carry out the work described above, at the total stated and on the terms set out.
Three of the six messages in the trade edition, for day 3, day 7 and day 14 after you send, in the language of this trade.
Why there is no amount anywhere. An AI does not know your buying price, your hours or your margin. Every figure a model invents is a guess you pay for. Quofo gives you the structure, the trade language and the completeness. You enter the amounts.
Start with the Starter Kit. It is nineteen dollars and it contains the two prompts that do most of the work. If you later want the automation and the dashboard, email me and you pay only the difference.